Newkirk Electric entered the solar market in 2008 and since then has been awarded over 100 utility-scale solar installations ranging in size from 5KW – 27MW To date, Newkirk has installed over 200 megawatts of solar power.
Newkirk has provided a truly comprehensive scope of services on these projects which has resulted in a depth of hands-on experience that spans the entire solar development process from design through installation. Newkirk self performs a majority of the management and construction of the projects as well providing direct experience and control.
Newkirk Electric offers flexibility in terms of the role we play on a solar project. We have successfully acted in a variety of roles including:
- Engineer-Procure-Construct (EPC)
- Design-Build Contractor
- Design Consultant
- Construction Manager
- General Contractor
- Electrical Subcontractor
- Civil Subcontractor
- Structural /Foundations Subcontractor
- Operations and Maintenance Subcontractor
Related Projects

Blue Wing 16MW Solar Power Plant
Location: San Antonio, TX
Role: General Contractor – Self Perform
Construction of 16MW solar PV, ground-mount, fixed system

Edgeboro 4.2MW Solar Plant
Location: Middlesex, NJ
Role: Engineer-Procure-Construct Contractor – Self Perform
Design-build 4.2MW, ground-mount fixed system

North Park 12.4MW Solar Power Plant
Location: Millstone, NJ
Role: General Contractor – Self Perform
Construction of 12.4 MW solar power plant

Florence 9.94MW Solar Power Plant
Location: Millstone, NJ
Role: Subcontractor
Construction of 9.9940 MW solar power plant