Renewable Energy: Hydro Power
Hydroelectric power was Newkirk Electric’s first foray into the renewable energy market several decades ago. In 1969, Newkirk was awarded the Ludington Pumped Storage project, a 1,872MW hydroelectric power pumped storage facility, as the prime electrical contractor. At its completion, the project was the largest of its kind in the world and was named one of Michigan’s “Top 10” civil engineering projects of the 20th century (Michigan Society of Civil Engineers).
Since then, Newkirk Electric has performed work on numerous renewable hydroelectric dams across the U.S. performing electrical installations and designing and installing the complete controls for the plants. In Michigan, Newkirk has worked on virtually all of Consumers Energy’s 13 hydroelectric dams across the state.
Related Projects

Ludington Pumped Storage
Location: Ludington, MI
Role: Primary Electrical Contractor
Electrical construction/upgrades for 1,750 MW pumped storage plant

Hardy Dam Unit 3 Turbine Upgrade
Location: Newaygo, MI
Role: Primary Electrical Contractor
Electrical upgrades to 33kw hydroelectric power plant