Project Overview
Newkirk was contracted by Holland Board of Water and Light to install 50 drilled pier foundations ranging from 24 to 84 inches in diameter and 28 to 40 feet in depth. The site was located adjacent to Lake Macatawa and the water table was at 3 feet from rough grade. All foundations were installed with the implementation of temporary steel casing and slurry.
Project: Pine Avenue 138kV Substation Foundations
Type: Drilling/Foundations
Location: Holland, MI
Role: General Contractor - Self Perform